FAST PHASE 1 ARCHIVE
April 2001-March 2004

HOME
chemical inhibitors
control of surface adhesion
flow modelling
inhibitor evaluation & selection
gas permeabilities
high pressure, high temperature
HPLC Analysis
mechanistic studies
naphthenates
oilfield scale
predicting the problem
scale dissolvers
squeeze treatments
team
students
collaborative students
SPONSORS
FAST PHASE 2
FAST PHASE 3
PUBLICATIONS
CURRENT PHASE

Oilfield Scale

Scale can cause loss of production due to blockages in the near-well formation, in the tubing or in the surface facilities.

Tubing, 12k
tubing

Safety Risks: Scale deposition causes downhole safety valves to block. Some scales present a radioactive hazard at the surface.

Near-well formation, 34k
near-well formation
Separator before scaling, 19k
separator before scaling
Separator after scaling, 16k
separator after scaling